African Entrepreneurship Record · Contents

CHAPTER 1555

Chapter 1555: Engineering Construction (2)

7 min read·Evil er er er

Upon returning to Rhein City, Ernst called upon the Ministry of Water Resources and other relevant departments to inquire about the current progress of East Africa’s water infrastructure projects.

"Just three days ago, I returned from Great Lake Province, where I focused on visiting the Xingguo Hydroelectric Power Station in Jinga City and inspected the construction of the Western Front water diversion project on the Sardinia Dida Plain in the northeastern region of Great Lake Province."

"Currently, in our country’s water infrastructure sector, there are numerous regional water diversion projects. I would like the Ministry of Water Resources to provide an accurate report on the specifics of these projects."

In response to Ernst’s inquiry, the current Minister of the East African Ministry of Water Resources, Moelbach, stated: "Your Majesty, regarding the current large-scale water diversion projects in our country, there are four in total, from north to south: the Sardinia Dida Plain water diversion project, the East African Plateau west-to-east water diversion project, the Mozambique north-to-south water diversion project, and the South African Plateau east-to-west water diversion project."

"However, as of now, only the Sardinia Dida Plain water diversion project and the South African Plateau east-to-west water diversion project have been specifically implemented."

"These two projects are the least difficult and have the weakest negative impact on the ecological environment. Among them, the South African Plateau east-to-west water diversion project is one of the projects currently receiving the most attention from the Ministry of Water Resources."

"We have completed the exploration and measurement work on the route, and the next step is to officially invite the nation’s top experts in water resources, ecology, engineering, and other fields to formulate the most reasonable plan, aiming to start construction by the end of next year."

The reason the Ministry of Water Resources prioritizes the east-to-west water diversion project is because it is one of the most important large-scale national construction projects in the Five Five-Year Plan.

After all, the South African Plateau region is East Africa’s energy and mineral base, and it is also a crucial agricultural production base for East Africa. Once the project is completed, it will have the greatest positive impact on the growth of East African national power.

Ernst is aware of this. Compared to the other water diversion projects, only the east-to-west water diversion on the South African Plateau involves the industrial development of the region, while the other water diversion projects mainly serve agriculture.

So he said: "Regarding the east-to-west water diversion project on the South African Plateau, do not rush to achieve swift results. If there are any issues, be vigilant. After all, the fundamental purpose of such large-scale water infrastructure projects is to lay a solid foundation for the overall economic development of the nation."

"Therefore, do not hastily complete the project within the period of the Five Five-Year Plan. Instead, focus on stability and aim to complete it within ten or even twenty years."

The construction cycle of such large-scale water diversion projects typically extends over ten years or more. Of course, this is generally the case, but in fact, with the improvement in industrial levels after entering the 20th century, East Africa’s capacity for large-scale project construction has advanced significantly.

Furthermore, after experiencing various large-scale project miracles during the era of planned economy, some East African officials have developed a somewhat flippant mindset.

Ernst can understand this mindset among some officials because, whether it is national water infrastructure, artificial canal construction, or large-scale infrastructure projects such as railways, roads, bridges, and ports, the East African government has basically achieved these remarkable accomplishments as planned.

However, from the last century to the early years of this century, these projects in East Africa have emphasized one distinctive feature: the pursuit of speed.

The reason for such urgency is related to Ernst’s requirements within the historical context at the time.

Before Ernst colonized East Africa, the full extent of East Africa could be described as "unclaimed territory," with hardly a proper road in sight, and the climatic conditions were relatively harsh.

At that time, the international environment and situation faced by East Africa were also not promising, as it was surrounded by wolves ready to pounce, and imperial powers were preparing to launch a scramble for the African continent.

This meant that if the colonial activities in East Africa could not rapidly transform into power, then all efforts by the Heixinggen Royal Family would likely only serve as a wedding gown for the great powers of the time.

Therefore, before the South African War, the mandate of the Heixinggen Royal Family was "rapid occupation, rapid migration, rapid development, rapid construction."

Transform the East African Colony into a family preserve capable of safeguarding colonial achievements in the face of competition and threats from the Great Powers.

The goal was to achieve a certain population scale, agricultural and industrial foundation, and even build a powerful army on the African continent before the 1880s arrived, sufficient to confront the threats posed by other colonial powers.

Thus, during the initial phase, every project in East Africa pursued "speed," primarily reflected in warfare and agricultural construction.

By the 1880s, East Africa had acquired a certain degree of self-preservation capability and had even developed into a nation of substantial scale; however, East Africa could not afford complacency at this time.

Because by then, European powers were beginning to massively flock into Africa, initiating a direct conflict between East Africa and the great powers after a long period of accumulation and development spanning two to three decades.

At that time, East Africa’s main adversaries were Portugal and the United Kingdom, directly sparking the South African War in the early 1890s, through which East Africa established its status in Africa.

The South African War, however, did not mean the end of East Africa’s development, as East Africa, now a regional power of considerable scale, began participating in international competition.

The most crucial aspect was competing with other countries in the industrial development field, for backwardness would lead to aggression; at that time, East Africa was still a backward agricultural nation.

This meant East Africa still faced the risk of imperialistic resurgence.

Much like modern Egypt’s short-lived rise under Ali’s reforms, Egypt had achieved a certain degree of "wealth and military power" through a series of reforms, but the specific results still failed to break free from the constraints of being a "backward agricultural nation." After England and France returned to Egypt, Ali’s reforms were officially deemed a failure.

East Africa in the early 1890s faced similar problems; an agricultural nation facing industrial nations had no advantage, even if temporary victories were achieved, subsequent failures were more likely — mainly due to the issue of error tolerance rate, which was much higher for industrial nations than agricultural ones.

Take, for instance, the South African War; the victory it brought East Africa was merely a period of peace, yet the defeated United Kingdom was hardly impacted. If East Africa rested on its laurels from the South African War, then new crises would inevitably follow.

Thus, from the 1890s onwards, transforming East Africa from an agricultural nation to a global industrial power in the shortest possible time became the primary political task of the East African government at that stage.

And after the 1890s, the pace of project construction in East Africa became even more rapid; in just thirty years, East Africa built over 200,000 kilometers of railway, millions of kilometers of roads, modernized a significant number of ports, and saw steel production enter a new stage annually...

One could say that East Africa, before and during World War I, created one miracle after another in the economic and engineering fields, thereby laying a solid foundation for East Africa to become a global power.

However, behind each of these economic miracles is a point that cannot be ignored, which is that in striving to escape poverty and backwardness as much as possible, East Africa also made significant sacrifices, and the blind pursuit of speed in construction left hidden dangers.

In summary, East Africa’s previous rough economic development model is no longer suitable for the current situation in East Africa.

As a newly industrialized power, East Africa must also face issues such as "rising labor costs," "global industrial overcapacity," "tariff barriers in various countries," "lack of product competitiveness," "low technological levels," and more. Therefore, beginning with the Five Five-Year Plan, the transformation of East African economic development commenced.

In the field of project construction, the past pursuit of progress without regard for worker safety, ecological impacts, and unscientific design is now outdated.

In simple terms, while previously East Africa’s economic development did not consider human life important, using Black labor as sacrificial resources, it clearly cannot gamble with the safety of its own citizens now.