Diary of a Criminal Investigator · Contents

CHAPTER 1073

Chapter 1073: Dismembered Corpses in the Stinking Ditch

6 min read·Braking was timely

After Lu Chuan returned to Haizhou City, life was very peaceful.

The case in Dongzhou City could not be concluded anytime soon, and Li Donglin stayed with the major crime team over there for more than ten days and still hadn’t returned.

In the blink of an eye, the first month had already passed.

Although Haizhou City is located in the northern part, spring always arrives a little earlier because it’s close to the seaside.

After mid-March, the weather has warmed up, and quite a few mountain flowers have bloomed.

Although Lu Chuan returned to the High-tech Zone bureau here, he has been keeping an eye on the case over in Dongzhou City.

After nearly a month, the entire case was basically sorted out.

The evidence related to Gao Xiaoguang’s previous ten cases has also been collected.

This timeframe is actually quite fast; after all, identifying the scene for ten cases could take more than ten days alone.

But the specific trial of the case and the subsequent sentencing might take even longer.

The primary reason is the extended timeline, involving many cases and the victims’ families, which all require a certain amount of time.

Li Donglin and the team could not possibly be stationed in Dongzhou City indefinitely.

After sorting out the case’s outline clearly, the major crime team was disbanded locally once all the cases were secured with evidence, and Li Donglin went back to the provincial office to report.

However, since the case has been solved, the subsequent phases belong to judiciary procedures. Li Donglin’s commendation report has been submitted to the higher-ups.

The night before last, Li Donglin called Lu Chuan, and after submitting the commendation report, people from the committee specially came down to verify and communicate.

An honorary collective first-class merit is assuredly coming; Lu Chuan’s exemplary hero title is still being discussed.

But judging from the message Li Donglin received, there probably isn’t much of a problem.

Lu Chuan actually doesn’t care much about rising in ranks, but to be honest, he really does care about merits.

Especially this time, he might receive the exemplary hero title, which, to be honest, makes Lu Chuan quite excited.

However, Lu Chuan hasn’t told his family about this news, thinking it’s not too late to communicate after everything settles.

At the end of March, the weather became even warmer, and during this period, it’s quite calm on the High-tech Zone bureau side, with no major cases arising.

Lu Chuan is also enjoying this calmness, spending time at home with his wife and kid.

The little one is very lively, frequently urinating on Lu Chuan.

A change occurred on March 28th.

As flowers bloom in spring, Haizhou City’s engineering projects started one after another.

Dongfeng Road was originally the heart of Haizhou City’s old town, although now, due to old buildings, fewer young people reside there, many locals are still accustomed to living here.

Behind the middle road, there’s a Dongfeng Waterway, originally a drainage channel for the residents of Dongfeng Road.

But later, as the drainage went underground, this water district slowly became abandoned. Although it no longer had sewage draining into it, some household waste was still disposed of inside.

The whole Dongfeng Waterway is about 3 kilometers long, having not been cleaned for a long time, its water started to stink more and more.

In recent years, it has become a notorious foul-smelling ditch known throughout Haizhou City.

To create a pleasant living environment, the Haizhou City government decided last year to start cleaning and reshaping such small residential waterways citywide.

This year, the relevant municipal works have started, with Dongfeng Waterway being the first cleaned.

However, the project was forced to halt after less than three days.

The reason is simple: workers discovered three woven plastic bags amid mud and rubbish clearing in the pool.

Normally, if they were ordinary plastic woven bags, it wouldn’t matter.

On the first day of clearing Dongfeng Canal, unknown things were already excavated from it. Therefore, these bagged wastes were essentially left uncleared, directly loaded onto garbage transports to the dump.

Originally, these three woven bags were also supposed to be loaded onto the garbage truck and taken directly to the landfill.

But the person directing the excavator took a glance and noticed something was wrong.

Because one of the woven bags was damaged, exposing something inside.

From afar, it seemed a bit like an arm, so the excavator director stopped the machine and took a closer look, confirming it.

Afterward, the construction team reported to the police.

The local police station staff promptly arrived at the scene, sealed it off, and as there were three woven bags, each quite large.

At a glance, it didn’t seem to belong to just one person.

Therefore, the police station did not rush to handle it but directly reported it to the High-tech Zone bureau.

Now Lu Chuan has brought the Criminal Investigation Team to the Dongfeng Canal.

The three woven bags are still in the dirt scoop of the bulldozer; the driver is already on the side being questioned, along with some other construction personnel.

"We began construction three days ago, everything was fine before, and the progress was quite fast these past few days. According to our plan, we should complete the dredging project within this week and then start treating the water body."

The construction supervisor’s name is Wang Hu.

Wang Hu has been working on municipal projects for many years. The engineering company he works for has connections with higher authorities, letting them secure numerous municipal projects each year.

Of course, now municipal projects are much tougher compared to before.

Not to mention whether one can get a project, even if secured, the project’s difficulty isn’t particularly severe, but the requirements have increased significantly.

Previously, quality demands on projects weren’t very high and settlement was relatively quick.

Also, there were many other shady dealings in these projects, like paving a road this year, then laying down a sewer next year.

Because of this, the road would need opening midway, then proceed with laying drains, after which they’d excavate other corridors the following year.

Overall, it portrayed a sense of no planning and no design, working wherever whichever got thought of.

One road could be tackled messily year after year, for ten or eight years; such occurrences were numerous.

But it’s no longer feasible now; municipal project demands have heightened considerably, like clearing the Dongfeng Canal this time.

The authorities only allotted a week, no matter what, the clearing must be completed, and the water body must be treated.

Clearing wasn’t an issue, and it could be accomplished quickly with large machinery, plus some manpower swiftly, but the water body cleaning was rather challenging.

Initially, the water body was basically uncleanable; it could only be completely drained out, followed by new water introduction, achieving the desired mountain-clear water-blue aesthetic effect that way.

But now looking at it, finishing this Dongfeng Canal’s cleaning within a week seems impossible.

The bulldozer has already excavated three woven bags from there, with one arm still exposed outside; no one knows whether more woven bags exist.